Exploration on closed-loop process for recovery of valuable metals from zinc concentrate leaching residue
CSTR:
Author:
Affiliation:

Qinghai Xianghe Non-Ferrous Metals Co.Ltd., Xining 811600 , China

Clc Number:

TF813;X758

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    There is a large stockpile of sulfur flotation tailings in a refinery in Qinghai, which contain 2%~3% of Zn, more than 10% of Pb and about 30% of Fe. To address this issue, this plant has adopted, as supporting measure, the pyrometallurgical + hydrometallurgical process to harmlessly treat the tailings. The tailings and hot filtration residue are mixed, pelletized, and smelted in an oxygen-enriched side-blowing furnace, the smelting slag is then fed into a fuming furnace to be volatilized, and the Zn hypoxide is enriched to enter off-gas dust; the produced Zn hypoxide is subject to two stages of leaching plus extraction process to recover Zn and other valuable metals. In this process, the recovery of zinc in off-gas dust is about 80%, that of indium about 75%; the off-gas dust from side-blowing furnace can be recovered and treated; the smelting slag from the fuming furnace can be used to make cement or eco-friendly bricks; the leaching liquid from hydrometallurgical process is returned to the hydrometallurgical system for zinc; the enriched metals and leaching residue can be sold,in this way, the objective of green metallurgy can be realized.

    Reference
    Related
    Cited by
Get Citation

彭造伟. 锌精矿浸出尾渣中有价金属回收闭环工艺探索[J]. 中国有色冶金, 2022, 51(1): 74-78,89.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 10,2021
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code