    Yunxi Wenshan Zinc Indium Smelting Co., Ltd adopted hematite Fe removal combined with SO2 reduction leaching for Zinc hydrometallurgy. Cu recovery had been relatively low in early production. To address the problem, the Company analyzed the behaviors and balance status of Cu in the production system, and found that low Cu leaching rate in SO2 reduction leaching section was the major cause for the low Cu recovery in the system. By increasing the reaction temperature by 10-15℃, leaching time by 30-45min and initial acidity to 20-30g/L in SO2 reduction leaching section, Cu leaching rate can be increased by about 11%; in addition, by controlling the volume of SO2 input at an appropriate level, generally 1.2 times the content of Fe3+ in the solution, Cu precipitation caused by excessive SO2 input can be avoided, and the loss of Cu into the leaching slag can be reduced. With the above measures, the final Cu recovery rate of the system is improved by about 10% up to 93%.

    Reference
    Related
    Cited by
Get Citation

周东林,王邦伟,许志杰,等.提高还原浸出炼锌系统铜回收率的实践[J]. 中国有色冶金, 2021, 50(5):54-58.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 26,2021
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code