Reliability Check of Flood Control Capacity of Mountainside Tailings Pond
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD926.4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the actual production and operation conditions of a mountainside tailings pond, two methods are used to analyze and compare the flood in the tailings pond. Under the premise of fully considering the influence of the backwater steel pipe in the tunnel, the discharge capacity of the drainage system in the tailings pond is analyzed and calculated in detail. Finally, the flood regulation calculation of the tailings pond is carried out by using the water balance method. According to the results of the flood regulation calculation, it is concluded that the flood control capacity of the tailings pond meets the requirements of the specification under the condition that the reservoir water level and the length of the dry beach are controlled according to the requirements and the drainage system is working normally. The purpose of this study is to provide technical support and guarantee for mining enterprises in the process of flood discharge and backwater facilities and safety flood management of tailings pond, and also to provide reference for fine management and standardized management of tailings pond.

    Reference
    Related
    Cited by
Get Citation

陈宇清,王明明,田文高, 等. 某傍山型尾矿库防洪能力可靠性研究[J].中国矿山工程,2025,54(4):57-62.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code