Analysis of Mineral Processing Technology and Research on EPCM Innovative Management Strategies for Kamoa-Kakula Copper Mine
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD952

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This research deeply focuses on the Kamoa-Kakula copper mine in the Democratic Republic of the Congo, and conducts a comprehensive analysis of its beneficiation process, covering key elements such as the properties of the raw ore, the design flow, the design indicators, and the crushing and grinding process flow. Moreover, it elaborates in detail on the innovative EPCM management strategies. Through a systematic analysis of the project, it fully demonstrates the crucial effectiveness of high-quality design and innovative management in the success process of the project, aiming to provide a highly valuable reference example for similar mining projects.

    Reference
    Related
    Cited by
Get Citation

陈名洁, 吕鸿, 陶志勇. 卡莫阿-卡库拉铜矿选矿工艺剖析与EPCM创新管理策略探究[J].中国矿山工程,2025,54(2):68-71.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code