    Abstract:

    One open-pit copper mine employs pre-split blasting control technology for steep end-slope mining. To further optimize the pre-split blasting parameters and analyze their impact on blasting effectiveness, this study introduces a multiple linear regression model. The target variables are the pre-split hole spacing and the distance from the pre-split crack to the buffer hole row, while the unfragmented rock volume serves as the predictor variable. Pre-split blasting experiments are conducted using a two-factor three-level uniform design method. The research findings are as follows: ① The multiple linear regression model achieves a good fit with ,indicating its suitability for optimizing pre-split blasting parameters; ② Keeping other pre-split blasting parameters constant, it is recommended to select pre-split hole spacing and the distance from the pre-split crack to the buffer hole row as 1.1m and 2.4m, respectively, to achieve the best blasting results; ③ Pre-split hole spacing shows a positive correlation with the unfragmented rock volume, while the distance from the pre-split crack to the buffer hole row has a greater impact on the unfragmented rock volume.

    Reference
    Related
    Cited by
Get Citation

李涛, 周斌, 艾纯明. 基于多元线性回归模型的预裂爆破参数分析[J].中国矿山工程,2024,53(4):21-25.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code