Study on the Design Scheme of Complex Ultra-high Fill Slope in a Mine Site
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD854

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Green and high-quality development is the background of the development of modern mining. It is necessary to implement the concept of green, safe, efficient and intelligent new mines. Relying on the conditions of the industrial site of a mining to dig and fill in, it has carried out discussions on the supporting structure design scheme for the high-filling slope under the conditions of limited land, and the slope waist construction has carried out a transmission structure for mining truck. The flexible geogrid retaining wall design scheme that can adapt to the uneven settlement of the filling slope is selected. For the two different slopes combination solutions, detailed stability analysis calculations were carried out. The determined design scheme can meet the requirements of engineering conditions, meet the requirements of green, safe, and environmentally friendly, and can provide a reference significance for similar projects.

    Reference
    Related
    Cited by
Get Citation

孙扬, 习泳, 齐路路, 等. 某矿山场地复杂超高填方边坡设计方案研究[J].中国矿山工程,2023,52(4):87-90.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code