Rediscussion on the Pass Drawing of Mine Shaft Filled with Ore
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD853

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    There are many advantages in pass drawing, but there are also some hidden dangers which affect its application. When the shaft is filled with ore, the shear stress of the shaft wall can be reduced, and the wear damage caused by collision and rolling on the shaft wall can be eliminated. The friction and wear caused by the shaft filling with ore can eliminate the impact of the unloading ore on the ore in shaft, and the cohesion of the ore in shaft is basically stable, reducing the probability of blockage due to arch forming in the shaft. Pass drawing when the mine shaft is full is an important measure to eliminate hidden danger.

    Reference
    Related
    Cited by
Get Citation

詹森昌. 再谈满井放矿[J].中国矿山工程,2022,51(4):21-24.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code