Analysis of Settlement and Deformation of Tailings Pond With Dam Constructed at One Go on Deep Overburden
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD926

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Tailings dam built on deep overburden with great compressibility will result in great settlement, especially by adopting the form of damming at one go. By taking a tailings pond in Qinghai as an example, SIGMA/W module of Geostudio software performs a simulation calculation on the settlement of tailings dam. The result shows that increasing excavation depth of foundation clearing can reduce the settlement of the dam body and dam foundation, but the effect isnt obvious; superelevation should be fully considered in design of tailings dam built on deep overburden. After completion of dam body construction and basic completion of dam body settlement, it is guaranteed that the dam crest elevation meets the design requirement.

    Reference
    Related
    Cited by
Get Citation

李云清, 李松.深厚覆盖层一次建坝尾矿库的沉降变形分析[J].中国矿山工程,2022,51(3):78-82.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code