Numerical Simulation Research on Timing of Abscission Grouting Hole Completion and Grouting
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD355

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to reasonably determine the timing of abscission grouting hole completion and grouting, this paper uses FLAC3D numerical simulation software to establish a numerical calculation model to simulate and analyze the evolution law of abscission during the advancement of the working face and the influence of the advancement of the working face on drilling. The research concluded that the timing for completing the abscission grouting drillhole is when the working face advances to 150m, and the best drilling position is 150m in front of the first cut and the middle position of the working face inclination.

    Reference
    Related
    Cited by
Get Citation

任有奎.离层注浆钻孔成孔及注浆时机数值模拟研究[J].中国矿山工程,2022,51(1):61-66.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code