Comparative study on different de-stress schemes for a deep-shaft and ultra-large mine
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD323

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    An iron mine is a ultra-large scale and ultra-deep one. Its ore body is particularly thick, thus the mining area is large. In order to ensure the safety of mining, it is planned that large strip pillars will be arranged between the panels. In this paper, the numerical simulation method is used for a comparative study on the stress characteristics and plastic zone distribution of different schemes, with de-stress schemes taken at the upper, middle and lower parts of panel pillars, and in de-stress schemes lengths respectively of 60m, 120m, 180m and whole length at the upper part of the panel pillars. The study mainly reveals the load-bearing effects of the different de-stress schemes schemes. Its results can provide reference for de-stress schemes mining under similar mining conditions.

    Reference
    Related
    Cited by
Get Citation

张爱民,刘育明,张少杰.深井超大面积开采不同卸压方案对比研究[J].中国矿山工程,2021,50(6):21-25.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code