A case study of the construction process of pile foundations for a bridge in a metallic mine area
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

U445

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The mined-out areas of a metallic mine, complemented by karst caves, made the construction of the pile foundations of a bridge above very difficult and resulted in poor piles. To ensure file construction quality, it was proposed to inject concrete into the mined-out areas and the karst caves in question, and to use steel sleeve pipes to ensure the quality of foundation bore holes. After these measures were taken, foundation quality tests showed that all the piles were of Class I, hence very successful. This attempt thus brings useful experience to operations under similar circumstance.

    Reference
    Related
    Cited by
Get Citation

刘双辰.某金属矿区桥梁桩基础施工技术研究[J].中国矿山工程,2021,50(4):77-79.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code