A case study of the shock attenuating effect on adjacent tunnels by short delay blasting initiated by digital electronic detonators
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD235

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To reduce the great vibration caused by the conventional blasting in the Jinduicheng stopes above the Dongchuan River tunnel, which is quite close to the stopes, digital electronic detonators were adopted and proper hole-to-hole and row-to-row blasting delays needed to be determined. Vibration was measured both inside the tunnel and on the working platform. A test was done comparing the different delays of digital electronic detonators and high precision blasting caps. Through studying the vibration wave profiles and other vibration data, the optimal short delay was determined to minimize the vibration. A blasting method that best controls the blasting vibration is thus found, to ensure the operation safety of the Dongchuan River Tunnel. As the result indicates, when the hole to hole delay is set at 30ms and row-to-row delay at 75ms, the blasting vibration frequency can be improved, reducing the vibration intensity by 22.7% as compared with the effect by conventional blasting. The test result serves as a good reference for further attenuating the blasting vibration in advanced stages of the Jinduicheng open-pit mine.

    Reference
    Related
    Cited by
Get Citation

李伟.基于数码电子雷管的微差爆破对临近隧洞降振效果研究[J].中国矿山工程,2021,50(4):60-64.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code