The analysis and handling of a fast-acting fuse fault of a rectifier panel in a main shaft hoist system
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD63+3

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The main shaft hoist system is powered by #1 and #2 electric current closed loop drive systems. The #2 rectifier panel could start when the electric current was under 1000A. However, as the current increased to 1800A, a “fast-acting fuse” alarm was registered, with one fast-acting fuse blown out, followed by abnormal sound of the motor. An investigation was made and the rectifier panel and the main drive system were checked. The wave forms of both primary and secondary sides of the panel were measured. Judging from the wave aberration, the 6RA70 digital speed regulating device was found to be broken, as the pulses distributed to the six sets of thyristors were uneven. Consequently the thyristors were unable to change phases normally, and the DC EMF and AC voltage were in series aiding, forming a short circuit, which blew out the fast-acting fuse.

    Reference
    Related
    Cited by
Get Citation

孙彩宏,朱家斌,魏云鹏,等. 主井提升系统整流柜快熔断故障分析与处理[J].中国矿山工程,2021,50(4):57-59.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code