Feasibility study and analysis of 20kV distribution design in metal mines
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD612

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    With the rapid development of China s national economy and the gradual expansion of power grid scale, power grids in some mining areas are no longer suitable for modern industrial power demand, which leads to poor operation of distribution systems in mining enterprises and drop of power factor and voltage of distribution networks. It is necessary to further optimize the energy distribution system of metal mine power grid and add dynamic energy compensation devices for real-time network tracking, so as to improve efficiency and energy quality and save operating costs.

    Reference
    Related
    Cited by
Get Citation

李二良.金属矿山20kV电压配电设计可行性研究与分析[J].中国矿山工程,2021,50(3):59-61.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code