Discussion on re-check calculation of flood discharge capacity of a tailings pond
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD926.4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the local hydrological manual, the flood calculation of a tailings pond is carried out, and the flood-regulating routing of the tailings pond is done by the water balance method. According to the calculation results, it is considered that the flood discharge capacity of the tailings pond meets the requirements of the code, which provides a reference for the recheck calculation of the flood discharge capacity of similar projects.

    Reference
    Related
    Cited by
Get Citation

郭中岳.浅谈某尾矿库排洪能力的复核计算[J].中国矿山工程,2021,50(3):52-56.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code