Sublevel open stoping with post-filling—a case of application and optimization
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD853.34

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The sublevel stoping with post filling method has been continuously improved in the operation of Tongshankou Copper Mine, both in mining and backfilling. The method was applied consecutively in 6 stopes at Level -160m, with operation indicators markedly improved: ratio of cutting/preliminary development and mining tonnage reduced by 17m3/kt, overall dilution and loss rates reduced by 2.23% and 2.42%, stope production capacity improved by 80.5t/d, direct cost of stope operation reduced by 44.2 yuan/t. The optimization thus serves as a good reference for the promotion of the mining method.

    Reference
    Related
    Cited by
Get Citation

朱先艳.分段空场嗣后充填法优化与应用[J].中国矿山工程,2021,50(3):12-15.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code