Heavy-duty commissioning practice of the ore crushing station and belt conveyorsystem in Mirador copper mine
DOI:
CSTR:
Author:
Affiliation:
Clc Number:
TD528
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
This paper describes several problems during the commissioning practice of the ore crushing station and belt conveyor system of the Mirador copper mine in Ecuador, analyzes the causes of the problems, and proposes solutions to the problems. It has certain reference significance to the similar mine commissioning.