    To ensure the safety of mine production,improve the level of resource utilization and extend the service life of the tailings pond,a full tailing cemented filling system is designed and constructed. Since the system has been put into use for many years,the filling capacity, slurry concentration and filling body strength meet the design requirements,the filling capacity, slurry concentration and filling body strength meet the design requirements, the technological specifications are stable. The successful application of the full tailings cemented filling system in Xitieshan lead-zinc mine has provided key technical support for the safe production of Xitieshan lead-zinc mine, and it has also provided benefits for the green, safe, efficient and economic mining of similar large-scale nonferrous mines in China.

    Reference
    Related
    Cited by
Get Citation

朱明,刘吉祥,李书昌,刘友龙.全尾砂胶结充填系统在锡铁山铅锌矿的应用[J].中国矿山工程,2021,50(2):9-12

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code