Application of inclined wall earth dam and riprap compaction combined with dynamic compaction replacement method in the heightening project of a tailings pond
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD926.4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on an example of the upstream water retaining dam heightening project for the tailings pond heightening, aiming at the requirements that there is a road on the dam crest to reserve and there is a large number of waste rock near the site to use, against the problem that the dam foundation has deposited thick fine tailings soil, the heightening scheme of using inclined wall earth dam and the dam foundation treatment method of riprap compaction combined with dynamic compaction replacement are recommended, the safety of the heightening scheme and the dam foundation treatment method is verified through the seepage and stability of dam, porosity measurement of dam fill and measured settlement data of the dam.

    Reference
    Related
    Cited by
Get Citation

胡祥群,岑建,杨国栋.斜墙土石坝和抛石挤淤结合强夯置换法在某尾矿库加高工程中的应用[J].中国矿山工程,2021,50(1):68-71

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code