Study on safety technology of fully mechanized mining face passing through collapse column
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD353

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In this paper, when 1606 fully mechanized coal mining face passes through X3 collapse pillar, the coal and roof strata are broken, the roof management measures of grouting reinforcement and arrangement of bumping wedge are put forward, the layout technical scheme is described in detail. In field application, the mining speed of working face is increased from 3.2m/d to 4.5m/d, avoid roof pressure. After grouting and wedge support, the coal wall and roof of the working face remain stable, the working face took 10 days to pass through the collapse column, and achieved remarkable application results.

    Reference
    Related
    Cited by
Get Citation

鲁蒙,舒梅,周横全.综采工作面过陷落柱安全技术研究[J].中国矿山工程,2021,50(1):42-43

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 24,2025
  • Published:
Article QR Code