动压影响下厚硬石灰岩顶板区段煤柱合理宽度优化及支护技术
DOI:
CSTR:
作者:
作者单位:

作者简介:

石新起(1999—),男,汉族,山东淄博人,硕士研究生在读,研究方向为矿山压力与岩层控制。

通讯作者:

中图分类号:

TD355

基金项目:


Coal Pillar Width and Support Design of Thick Hard Limestone Roof Section Under Dynamic Pressure
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为了解决厚硬顶板条件下受多次采动影响巷道区段煤柱留设宽度不合理的问题,以东泰鑫源煤矿10109运输顺槽为工程背景,采用理论计算分析、数值模拟和工程实践等方法进行研究。研究结果表明:针对厚硬顶板进行切顶卸压,理论计算得到切顶高度27m,切顶角度0°;数值模拟结果显示煤柱宽度低于16m时受两次采动影响后煤柱均存在高应力集中,塑性破坏严重。煤柱宽度高于16m后,煤柱内弹性核区面积占比大于50%,巷道围岩稳定,结合计算得出受两次动压影响巷道区段煤柱合理留设宽度为16.5m,提出了以“强帮护顶”为主的支护方案,现场监测一次采动影响下10109运输顺槽顶底板表面最大位移165mm,两帮表面最大位移118mm。16.5m宽度区段煤柱结合联合支护技术可有效控制受动压影响的巷道围岩变形。

    Abstract:

    To address the issue of the excessive width of coal pillars in roadway section affected by multiple mining under the condition of thick hard roof, based on the engineering background of Dongtai Xinyuan Coal Mine 10109 transport channel, theoretical calculation and analysis, Flac3D simulation and engineering practice were adopted to carry out top cutting and pressure relieving for thick hard roof. It is determined that the reasonable remaining width of coal pillar in roadway section affected by two dynamic pressures is 16.5m. The findings indicate that the cutting height is set at 27 meters with an angle of 0°. The numerical simulation demonstrates that when the coal pillar width is below 16 meters, the coal pillar has high stress concentration and serious plastic failure after being affected by two mining movements. When the width of coal pillar is higher than 16m, the elastic core area within the coal pillar exceeds 50%, ensuring the stability of the surrounding rock in the roadway. Therefore, a support plan utilizing a “Strengthen the side to protect the top” has been suggested. The maximum surface displacement of the top and bottom plate of 10109 transport trough under the influence of one mining is 165mm, and the maximum surface displacement of the two sides is 118mm. The coal pillar in the 16.5m wide section, along with the combined support technology, can effectively manage the deformation of the roadway's surrounding rock under dynamic pressure.

    参考文献
    相似文献
    引证文献
引用本文

石新起,张建忠,李坤.动压影响下厚硬石灰岩顶板区段煤柱合理宽度优化及支护技术[J].中国矿山工程,2025,54(1):1-7.

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2025-12-24
  • 出版日期:
文章二维码