    摘要:

    矿仓是矿石溜放运输的重要通道,其经常遇到矿石的冲击破损,严重影响矿山的正常生产。基于矿石运动轨迹及能量转化与守恒原理,对矿仓井壁破损机理进行了详细分析。针对国内某矿山转运矿仓返修条件,提出了4个可行的加固技术方案,对各技术方案优缺点进行了详细分析,并对其各因素影响程度进行了横向对比,得出最优的且符合矿山实际情况的技术方案并付诸于实践应用。应用结果表明利用这一技术方案能够明显减少矿仓井壁冲击破损现象,达到保护矿仓的目的,实现了矿山安全生产,对改进矿山矿仓缓冲设计和生产管理具有一定的实际意义和工程价值。

    Abstract:

    Ore bin is an important channel for ore sliding conveyance, it is often damaged by ore impact, which severely affect the normal production of the mine. On the basis of ore movement trajectory and energy conversion and conservation principle, detailed analysis is conducted for the damage mechanism of ore bin wall. Aiming at the repair conditions of the transfer ore bin of a certain mine in China, four feasible technical options for reinforcement are put forward, detailed analysis is made for the pros and cons of various technical options, and the lateral comparison is conducted for the affecting extent of various factors. The optimal option fitting the mine actual conditions is obtained and applied to the practical use. The application results show that using this technical option can remarkably reduce the phenomenon of broken damage of ore bin wall so that the goal of protecting ore bin is achieved and the safe production of the mine is realized, which has a certain practical significance and engineering value for improving the buffer design of the ore bin of the mine and the production management.

    参考文献
    相似文献
    引证文献
引用本文

郭相参.某矿山矿仓加固技术方案比选及应用[J].中国矿山工程,2022,51(2):20-24.

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2025-12-24
  • 出版日期:
文章二维码