Optimization design of high-efficiency graded dehydration filling process for total tailings and study on sand bin performance
CSTR:
Author:
Affiliation:

1.Jinxin Mine Engineering Co., Ltd., Beijing 100070 , China ; 2.Beijing Jinxin Mining Technology Research Institute, Beijing 100070 , China ; 3.Jinchengxin Paste Filling Laboratory, Beijing 100070 , China

Clc Number:

TD853

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This study proposes a novel graded dehydration filling process for total tailings. The process involves the classification of total tailings into coarse and fine fractions, with the coarse fraction undergoing natural gravity sedimentation for dehydration and the fine fraction undergoing flocculated gravity sedimentation. To implement this process, specialized graded dehydration equipment has been developed. Compared to traditional total tailings dehydration methods, this graded dehydration process significantly enhances concentration efficiency, reduces energy consumption and dehydration costs, and minimizes environmental pollution. The process exhibits broad applicability, particularly for total tailings filling projects in non-coal metal mines, offering a new technical pathway for the sustainable development of mine filling technology.

    Reference
    Related
    Cited by
Get Citation

田小平,吴学民,王莹莹.全尾砂高效分级脱水充填工艺优化设计与砂仓性能研究[J].有色设备,2025,39(1):92-97.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 16,2024
  • Revised:
  • Adopted:
  • Online: November 13,2025
  • Published:
Article QR Code