    Abstract:

    A copper company is the first copper smelting enterprise in the world to adopt side-blowing + top-blowing copper smelting process with a single production capacity of 300kt/a, which makes this copper smelting process reach a breakthrough production capacity height. The production of the side blowing furnace is generally normal, but the top blowing furnace has a big gap in the earlier construction process, in the later stage of production, there are some important problems such as too high temperature of furnace bottom and floating of refractory brick in working layer of furnace bottom, this paper points out the cause of the big gap in the process of building the top blowing furnace and the basic reason of the bottom problem caused by the unreasonable structure of the top blowing furnace body and the setting of the expansion gap, and put forward the solution to these problems.

    Reference
    Related
    Cited by
Get Citation

袁精华.顶吹吹炼炉问题剖析与解决方案[J].有色设备,2023,37(5):67-70.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 26,2023
  • Revised:
  • Adopted:
  • Online: November 24,2025
  • Published:
Article QR Code