Abstract:Aiming at the main problems existing in the first-phase emergency power supply system, the capacity of new diesel-generator set is calculated scientifically to meet the enterprise’s power demand of first order load; the reasonable use of mature technology and equipment not only reduce the cost and construction difficulty, but also improve the reliability and quick response ability of the expanded emergency power supply system. After the expanded system is put into use, it can fully meet the needs of safety production.