Brief Discussion on Emergency Power Supply System Expansion Design of An African Copper Smelting Enterprise
CSTR:
Author:
Affiliation:

Clc Number:

TN86;TF083.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Aiming at the main problems existing in the first-phase emergency power supply system, the capacity of new diesel-generator set is calculated scientifically to meet the enterprise’s power demand of first order load; the reasonable use of mature technology and equipment not only reduce the cost and construction difficulty, but also improve the reliability and quick response ability of the expanded emergency power supply system. After the expanded system is put into use, it can fully meet the needs of safety production.

    Reference
    Related
    Cited by
Get Citation

朱世薇,许云海.浅谈非洲某火法炼铜企业应急供电系统扩建设计[J].有色设备,2022,36(4):48-52.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 02,2022
  • Revised:
  • Adopted:
  • Online: November 24,2025
  • Published:
Article QR Code