Maintenance and Improvement of 72MVA Nickel Iron Electric Furnace
CSTR:
Author:
Affiliation:

Clc Number:

TF33

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The overhaul of the first furnace period of the two 72MVA nickel-iron electric furnaces designed by China ENFI in Dagon Mountain, Myanmar has completed where No. 1 electric furnace, with the campaign length being six and a half years, started heating up in August 2012, and shut down for maintenance from February to May 2019; No. 2 electric furnace started heating up in May 2013, and shut down for maintenance from December 2020 to May 2021, with the campaign length of seven and a half years. This paper introduces the overhaul and design improvement of 72MVA nickel-iron electric furnace, expecting to contribute to the development of nickel-iron electric furnace technology and equipment.

    Reference
    Related
    Cited by
Get Citation

崔大韡.72MVA镍铁电炉检修与改进[J].有色设备,2022,36(3):59-61.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 10,2022
  • Revised:
  • Adopted:
  • Online: November 24,2025
  • Published:
Article QR Code