Abstract:This paper gives a brief comparison of emergency power supply equipment versus non-electrical security measures commonly seen in non-ferrous smelters, analyzes the main issues existing in the current engineering practice, and enables the integrated monitoring of emergency power supply system and equipment health management by virtue of PLC and production distributed control system, thereby improving the reliability and controllability of the emergency power supply system.