Surpac-based Geological Modeling and Reserves Estimation of a Lead-zinc Mine
CSTR:
Author:
Affiliation:

Clc Number:

TD166;P628

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Intelligent mines are currently the general trend of the industry, and 3D visualized geological modeling is the basis for intelligent construction of mines. This article mainly focuses on the construction of a database of a lead-zinc mine based on Surpac software, and builds deposit models, block models, and surface 3D models on this basis. At the same time, graphical constraints, interval constraints, and resource/reserve estimation are carried out in this article to provide a visualized model and feasibility basis for the scientific definition of the mining method and the preparation of the production schedule for a lead-zinc mine, playing a significant role in the “cost reduction and efficiency increase” in the future production implementation process. The results show that the use of Surpac to conduct visualized 3D modeling of spatial distribution can better solve the challenges in the current mine information management era.

    Reference
    Related
    Cited by
Get Citation

张靖宇,张龙,赵宗义,等.基于Surpac的某铅锌矿地质建模及储量估算[J].有色设备,2022,36(1):44-48.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 15,2021
  • Revised:
  • Adopted:
  • Online: November 24,2025
  • Published:
Article QR Code