China ENFI “MIM+”:Provides a Chinese Plan for Improving the Management and Control of Global Mining Projects-written on the Occasion of the Accelerated Construction of the Kamoa-Kakula Copper Mine
CSTR:
Author:
Affiliation:

Clc Number:

TF811

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The challenges of global mining project management are superimposed on the new crown epidemic, which has brought more difficulties to project management. Based on the MIM+ solution, ENFI built a digital integrated project execution system, which was successfully applied in the Kamoa-Kakura Concentrator Project. Chinas solution is provided to improve the management and control level of global mining projects.

    Reference
    Related
    Cited by
Get Citation

封志强,孙明俊,边超.中国恩菲“MIM+”:为提升全球矿业项目管控水平给出中国方案——写在卡莫阿-卡库拉铜矿加速建设之际[J].有色设备,2021,35(6):110-113.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 22,2021
  • Revised:
  • Adopted:
  • Online: November 25,2025
  • Published:
Article QR Code