Discussion and Case Analysis on the Selection of Synchronization Point in Waste Incineration Power Plant
CSTR:
Author:
Affiliation:

Clc Number:

TM62

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The selection of synchronization point is closely related to the main electrical connection and operation mode.The power of the assembling units fluctuates from 9 to 30MW, in the waste incineration power plant.For these small-load plants, which main electrical connection has its own characteristics, comparing with the large power plant, and the corresponding selection of synchronization point is also considered from different angles.Combined with practical engineering examples, this thesis introduce the design thought of selecting synchronization point , and presents the author’s own viewpoint.

    Reference
    Related
    Cited by
Get Citation

张莹.垃圾焚烧发电厂同期点选择的探讨及实例分析[J].有色设备,2021,35(3):43-46.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 07,2021
  • Revised:
  • Adopted:
  • Online: November 25,2025
  • Published:
Article QR Code