Failure Analysis of Reactor Discharge Cooler
CSTR:
Author:
Affiliation:

Clc Number:

TQ051.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In a petrochemical project, the parameters of reactor discharge cooler in the reaction and C3 concentration unit are abnormal, which eventually leads to the shutdown of the unit. When the equipment is stopped for inspection after 4 months of operation, no problems have been found in the operation of the equipment. Within one month after the start-up, after more than 10 times of startup and shutdown due to unstable operation of the unit, the water and gas balance of the reactor discharge cooler is seriously unbalanced, and serious leakage occurs and the device stops. In this case, the factory and engineering company have analyzed the failure of the reactor discharge cooler.

    Reference
    Related
    Cited by
Get Citation

孙宇鹏.关于反应器出料冷却器的失效分析[J].有色设备,2021,35(3):32-38.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 17,2021
  • Revised:
  • Adopted:
  • Online: November 25,2025
  • Published:
Article QR Code