Application of an Emergency Quality Guarantee Process during the Quasi Class IV Upgrading and Reconstruction of a Sewage Treatment Plant
CSTR:
Author:
Affiliation:

Clc Number:

X703

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    During the upgrading process, to prevent production disruption and ensure stable product water quality, a sewage treatment plant has made full use of the existing and new process units through reasonable construction planning, and established a temporary process line of “super magnetic pretreatment+membrane grille+MBR membrane cisterns” to carry out in-plant diffluent treatment, effectively solving the sewage discharge problem that may be caused by upgrading-induced production reduction of the original system. By adopting the emergency quality guarantee process, the product water quality during the upgrading was kept stable and met the discharge requirements (CODcr≤50mg/L, ammonia nitrogen≤5(8)mg/L, total nitrogen≤15mg/L, total phosphorus≤0.5mg/L). The emergency process thus prevented the possible environmental pollution of sewage discharge due to production reduction, and the investment was low.

    Reference
    Related
    Cited by
Get Citation

姚亮, 李鹏, 张赛, 等. 污水厂准Ⅳ类提标改造期间的应急保障工艺应用[J]. 有色冶金节能,2022,38(4):79-82.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 04,2022
  • Revised:
  • Adopted:
  • Online: November 19,2025
  • Published:
Article QR Code