Upgrading Design of Industrial Wastewater Treatment in a Plant in Beijing
CSTR:
Author:
Affiliation:

Clc Number:

X703

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The wastewater treatment system of a factory in Beijing was old ,and the removal of CODCr, ammonia nitrogen, phosphorus and other pollution factors was limited, so it was reformed in basis of the old system. The old intermediate water tank, regulation tank, biochemical tank and sand filter were transformed into anoxic denitrification tank, aerobic+MBR tank, chemical phosphorus removal sedimentation tank and breakpoint chlorination reaction tank, respectively. The optimal reagent concentration of chemical phosphorus removal and inflection point chlorination process was determined. After the transformation, the effluent quality of the system was stable, meeting the requirements of Integrated discharge standard of water pollutants (DB 11/307—2013 ).

    Reference
    Related
    Cited by
Get Citation

易亚杰.北京某工厂工业污水处理提标改造设计[J].有色冶金节能,2021,37(3):56-59.

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 01,2021
  • Revised:
  • Adopted:
  • Online: November 27,2025
  • Published:
Article QR Code