Fault Diagnosis and Research of PS Converter Boiler
CSTR:
Author:
Affiliation:

Clc Number:

TF806.26;TF811

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    After years of operation, the heating tubes of five PS converter boilers in a smelter often leak, which seriously affect the normal operation of the converter. By analyzing the process conditions, water quality control and equipment management of PS converter boiler, the causes of heat pipe leakage were found, and specific solutions and measures were suggested, such as restoring the functions of key parts of the boiler, improving water quality management and strengthening operation management, so as to provide reference for the maintenance, emergency treatment and professional management of PS converter boiler.

    Reference
    Related
    Cited by
Get Citation

胡喆祺,刘磊,柳俊杰. PS转炉锅炉故障诊断与研究[J].绿色矿冶,2021,(1):37-38

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 20,2020
  • Revised:
  • Adopted:
  • Online: November 27,2025
  • Published:
Article QR Code